Mining hosting, large overseas mines

Dual-line 450MW power supply, which can be used to power up 300,000 miners at the same time

RHY mine scene

Mining machine hosting related parameters

Bitcoin mining machine and Ethereum mining machine overseas hosting

  • Antminer ?
    T9+, S9 series,, S15 series L3 series, etc., can be managed by mining machine type details
    Avalon ?
    A851, A841, etc.,can be managed host type details, contact customer service
    Pangolinminer ?
    M3, M10, etc., can be managed to mine type details, contact customer service
  • Min-amount ?
    Mining machine hosting 500 units
    500 units
    500 units
    500 units
  • International Shipping ?
    Based on actual conditions and settlement by third-party international logistics companies
    Around $3 per unit
    Around $3 per unit
    Around $3 per unit
  • Income Distribution
    Customer designated mining pool
    Customer designated mining pool
    Customer designated mining pool
  • Income hand out
    Customer designated wallet
    Customer designated wallet
    Customer designated wallet
  • Electricity Cost ?
    1 degree =1kw/h
    0.037USD/kwh 0.028 USD/kwh ?
    Activity limited time to buy: as of 2019-3-31
    Activity limited edition: 10,000 managed seats
    Monthly average BTC price Managed electricity bill
    less than 3,729.851 0.028USD/kwh
    3,731.343-4,102.985 0.030USD/kwh
    4,104.478-4,476.119 0.031USD/kwh
    4,477.612-4,849.254 0.033USD/kwh
    4,850.746-5,222.388 0.034USD/kwh
    5,223.881-5,595.522 0.036USD/kwh
    5,597.015-5,968.657 0.037USD/kwh
    5,970.149-6,341.791 0.039USD/kwh
    6,343.284-6,714.925 0.040USD/kwh
    6,716.418-6,678.955 0.042USD/kwh
    7,089.552-7,461.194 0.043USD/kwh
    746.269-7,834.328 0.045USD/kwh
    7,835.821-8,207.463 0.046USD/kwh
    more than 8,208.955 0.048USD/kwh
    0.037USD/kwh 0.028 USD/kwh ?
    Activity limited time to buy: as of 2019-3-31
    Activity limited edition: 10,000 managed seats
    Monthly average BTC price Managed electricity bill
    less than 3,729.851 0.028USD/kwh
    3,731.343-4,102.985 0.030USD/kwh
    4,104.478-4,476.119 0.031USD/kwh
    4,477.612-4,849.254 0.033USD/kwh
    4,850.746-5,222.388 0.034USD/kwh
    5,223.881-5,595.522 0.036USD/kwh
    5,597.015-5,968.657 0.037USD/kwh
    5,970.149-6,341.791 0.039USD/kwh
    6,343.284-6,714.925 0.040USD/kwh
    6,716.418-6,678.955 0.042USD/kwh
    7,089.552-7,461.194 0.043USD/kwh
    746.269-7,834.328 0.045USD/kwh
    7,835.821-8,207.463 0.046USD/kwh
    more than 8,208.955 0.048USD/kwh
    0.037USD/kwh 0.028 USD/kwh ?
    Activity limited time to buy: as of 2019-3-31
    Activity limited edition: 10,000 managed seats
    Monthly average BTC price Managed electricity bill
    less than 3,729.851 0.028USD/kwh
    3,731.343-4,102.985 0.030USD/kwh
    4,104.478-4,476.119 0.031USD/kwh
    4,477.612-4,849.254 0.033USD/kwh
    4,850.746-5,222.388 0.034USD/kwh
    5,223.881-5,595.522 0.036USD/kwh
    5,597.015-5,968.657 0.037USD/kwh
    5,970.149-6,341.791 0.039USD/kwh
    6,343.284-6,714.925 0.040USD/kwh
    6,716.418-6,678.955 0.042USD/kwh
    7,089.552-7,461.194 0.043USD/kwh
    746.269-7,834.328 0.045USD/kwh
    7,835.821-8,207.463 0.046USD/kwh
    more than 8,208.955 0.048USD/kwh
  • Mine infrastructure fee ?
    Mine construction, power supply facilities, expansion tax, etc.
    2.985USD/units
    2.985USD/units
    2.985USD/units
  • Repair parts fee
    Maintain and replace accessories
    Maintain and replace accessories
    Maintain and replace accessories
1. Pay two months' electricity bill in advance (pay one for one), and the position needs to be placed on the shelf (requires 60 days to go on shelves, including 25 days of shipping logistics time).
2. The mining machine is hosted at the RHY mine, which is deployed by the mine professionals and is on duty 24 hours a day.
3. you need to submit your mining settings information before payment: mining type, digital asset wallet address, or set before shipment.
4. The mining machine can complete the deployment and start mining within 5 working days after the arrival of the mining machine. You can view the calculation power and income through the mine pool link.

Mining machine hosting process

Simple four-step, easy mine hosting

After buying mining

Choose hosting service

Wait for delivery

To mine

arrived mine

Deploying mining by professionals

Minings

Gain profit

Real-life picture of mining machine

Large mine, professional RHY mining center

60MW overseas transformers directly supplied by Jiangsu Huapeng

Cable and mining machine

Mining maintenance will be undertaken by the platform during warranty

Cooling curtain

Exhaust system

Switch room